Skip to content

Architectural Design in Portsmouth

Measured surveys, drawings, planning applications and building regulations packages: the paperwork that gets your project approved.

About this service

A good build starts long before anyone picks up a trowel. Our architectural service turns a rough idea into a set of drawings your local authority will approve and your builder can actually work from.

Because we build as well as design, our drawings stay grounded in what’s actually buildable and what it’ll actually cost. You won’t get a beautiful scheme that falls apart the moment it meets a real budget or a party wall.

What we cover

  • Measured building surveys and existing-condition drawings
  • Concept design and feasibility studies
  • Full planning application drawings and submission
  • Permitted development certificates (Lawful Development)
  • Building regulations packages and structural calculations
  • Party wall advice and awards
  • Listed building and conservation area applications
  • 3D visualisations so you can see it before you commit

How it runs

Our architectural design process

01

Survey and brief

We measure the property accurately and sit down with you to understand the brief: how you want to live in the space, what the budget is, and where you’re willing to compromise.

02

Design and consultation

You get concept drawings to react to. We revise them with you, and where it helps we make informal contact with the planning department before we submit anything.

03

Submission and approval

We prepare and submit the application, handle planning officer queries on your behalf, and then produce the technical drawings your build needs.

Questions

Architectural Design FAQs

Answers to what people usually ask before booking architectural design work.

Do I have to use you for the build as well?

No. Plenty of clients come to us for drawings alone and take them to another builder, and that’s completely fine. The drawings are yours.

How long does planning permission take?

A householder application is usually determined within eight weeks of validation, though the drawing and preparation stage before that typically takes three to four weeks.

What if planning is refused?

We talk through the officer's reasons with you and advise whether an amended scheme, an appeal, or a different approach is the sensible next move.

Architectural Design across Hampshire

We take on architectural design work in Portsmouth, Southsea, Fareham, Gosport, Havant, Waterlooville, Emsworth, Chichester, Petersfield, Hayling Island, Portchester and Cosham.

Other services

Get in touch

Thinking about a project?

Tell us what you’ve got in mind and we’ll come and take a proper look.